30 November 2010
Lockerbie 3 to Reopen Ahead of Schedule
James Jones and Sons Ltd have announced that their Lockerbie 3 sawline was re-commissioned on 25th October 2010, and has successfully resumed production more than a week ahead of schedule.
A fire on the Lockerbie 3 sawline on 16th June this...